Risk Based Inspection (RBI) methodology enables the assessment of the likelihood and potential consequences of pressure equipment failures.
Risk Based Inspection (RBI) methodology enables the assessment of the likelihood and potential consequences of pressure equipment failures. RBI provides companies the opportunity to prioritize their equipment for inspection; optimize inspection methods, frequencies, and resources; develop specific equipment inspection plans; and enable the implementation of Reliability Centered Maintenance. This results in improved safety, lower failure risks, fewer forced shutdowns, and reduced operational costs.
The risk-based approach needs:
This Pioneers Risk Based Strategies for Inspection & Maintenance (RBI & RBM) training course combines presentation of the key principles, methods, and best practices and enforces the learnings with case studies and Question & Answer workshops to maximize the benefits to the participants. The comprehensive course notes and presentation material will provide valuable reference.
ORGANISATIONAL IMPACT
PERSONAL IMPACT
DAY 1
Course Objectives and Overview
Significance of Inspection in Plant Integrity and Maintenance Costs o The Real Function of Inspection
o Inspection Key Performance Indicators
Common Inspection Strategies and Their Limitations Risk-Based Decision-Making Fundamentals and Tools
o Risk Assessment – Probability of failure, consequences of failure
o Risk Management – Avoidance, Mitigation o Risk Communication
Understanding and Managing Risk o Principles Risk Assessment
o Risk Assessment Elements
o Qualitative, Semi-quantitative, and Quantitative Assessment ·
Workshop 1- Illustrative Example of Risk Assessment
DAY 2
▪Risk Based Inspection (RBI)
▪ Definitions
▪ Evolution
▪ Key Elements of RBI
▪ Reasons for implementing RBI
▪ Benefits and Limitations of using RBI
▪ RBI as a part of plant integrity management
▪ Economic Benefits
▪ API Risk-Based Inspection
Methodology
▪ API RP 580
▪ API BRD 581 – Various levels of RBI Analyses
▪ Impact of RBI on Related API Codes, Standards, and Recommended Practices
▪ API 510, 570 and 650
▪ API 579 Fitness-For-Purpose
▪ API Risk Based Inspection Software
▪ Workshop 2 – Q&A on API RBI Methodology
DAY 3
Overview of API 571 – Recognition of Conditions Causing Deterioration of Failure
Workshop 3 – Case studies involving a few equipment damage and failures, and learnings.
DAY 4
Development of Inspection Plan (Based on RBI Risk Ranking)
· Inspection Planning Guidance
o Essentials for Establishing a Successful RBI Program
o The RBI Team – Recommended Structure and Mandate
o Equipment Criticality Rating · Equipment Data Base
o Shared Database by RBI and RCM o Importance of Data Quality
o Computerized Maintenance Management Systems
DAY 5
o Data Quality
o Corrosion Rate Calculations o Remaining Life Calculations
5850 USD
Paris - France
5 Days
22nd December 2024
Click to Check PDF